So far, so good. We are off to a great start this year and everything is running smoothly. We are still on Northridge Lane and expect to start work on Santa Teresita Drive tomorrow.
Tuesday, September 14, 2010
Friday, September 10, 2010
Annual Road Clearance Project Starts Monday
With a little delay and much better timing, our annual Vegetation Road Clearance project is scheduled to start Monday, September 13.
The roads we will be focusing on next week are:
Northridge Road
Santa Teresita
Marilyn Way
The following week (9/20):
Las Canoas Road
Rockwood Drive
El Cielito Road
Please be courteous and patient with our crews as they work. At times traffic may be slowed to 1 lane. Delays are not expected to be over 5 minutes.
Conejo Rd - BEFORE |
The roads we will be focusing on next week are:
Northridge Road
Santa Teresita
Marilyn Way
The following week (9/20):
Las Canoas Road
Rockwood Drive
El Cielito Road
Please be courteous and patient with our crews as they work. At times traffic may be slowed to 1 lane. Delays are not expected to be over 5 minutes.
Every effort is made to communicate with homeowners with regards to work that will occur on properties so that they are more prepared, informed and education about wildfire and the need for road clearance throughout the City's high fire hazard areas.
Conejo Rd - AFTER |
If you have any questions, comments or concerns please feel free to contact us by phone (805) 965-5254 or email aanderson@santabarbaraca.gov
Wednesday, August 4, 2010
Here They Are
The roads that will be cleared through our annual vegetation road clearance program have been finalized. We are out to bid for contractors this week and anticipate starting before the end of the month.
The Purpose of Vegetation Road Clearance is to:
1. Reduce the amount of vegetation along roadways
2. Enhance evacuation during a wildland fire
3. Allow greater access for fire engines and equipment to respond during a wildfire
It is very important to maintain and keep up the work that has been completed. Maintaining our roadways is not only important for your safety but the safety of the community. Santa Barbara City Municipal Code requires homeowners to make sure that vegetation on their property does not encroach onto adjacent roadways. This effort includes keeping evacuation routes clear of flammable vegetation and thinning vegetation along the roadways.
Below is a list of roads that will have clearance work performed.
Alston Rd (Cima Linda Ln to Rametto Rd and Summit to City Limits)
Barker Pass Rd (Eucalyptus Hill to City Limits)
Bonita Way
Cedar Ln
Cima Linda Lane
Circle Drive
Coyote Rd (Sycamore Canyon to City Limit)
Dover Rd
Drexel Drive
E Padre St (Emerson to Laguna)
E Pedregosa St (Laguna/Olive to APS)
El Cielito Rd (Stanwood to Mountain Drive)
Emerson Ave (E Padre to Pedregosa)
Eucalyptus Hill Rd (Eucalyptus Court to Clifton and Cedar to Alston)
Foothill Road (Mountain to City Limits)
Grand Ave (Plaza Bonita to Pedregosa)
Grand Ave (Valerio to California)
Hillcrest Rd (Mountain to Franceschi Rd)
Las Canoas Rd (Gibraltar to El Cielito)
Las Tunas Rd
Lasuen Rd (APS to Alvarado)
Loma St (Pedregosa to Moreno)
Maple St
Marilyn Way
Mission Ridge Road (Las Alturas to Mountain)
Montgomery St (Emerson to Laguna)
Mountain Drive (City Limits to El Cielito and Mission Ridge to Los Olivos)
Northridge Rd
Orizaba Ln
Overlook Ln (South of APS only)
Rametto Rd (Alston to Summit)
Roble Ln
Rockwood Dr
Santa Teresita Dr
Sierra St
Stanwood Drive
Summit Rd (Alston to Rametto)
Sycamore Canyon (5 Points to Westmont Rd)
Westmont Rd (Sycamore Canyon to top of Circle Drive)
The Purpose of Vegetation Road Clearance is to:
1. Reduce the amount of vegetation along roadways
2. Enhance evacuation during a wildland fire
3. Allow greater access for fire engines and equipment to respond during a wildfire
It is very important to maintain and keep up the work that has been completed. Maintaining our roadways is not only important for your safety but the safety of the community. Santa Barbara City Municipal Code requires homeowners to make sure that vegetation on their property does not encroach onto adjacent roadways. This effort includes keeping evacuation routes clear of flammable vegetation and thinning vegetation along the roadways.
Below is a list of roads that will have clearance work performed.
Alston Rd (Cima Linda Ln to Rametto Rd and Summit to City Limits)
Barker Pass Rd (Eucalyptus Hill to City Limits)
Bonita Way
Cedar Ln
Cima Linda Lane
Circle Drive
Coyote Rd (Sycamore Canyon to City Limit)
Dover Rd
Drexel Drive
E Padre St (Emerson to Laguna)
E Pedregosa St (Laguna/Olive to APS)
El Cielito Rd (Stanwood to Mountain Drive)
Emerson Ave (E Padre to Pedregosa)
Eucalyptus Hill Rd (Eucalyptus Court to Clifton and Cedar to Alston)
Foothill Road (Mountain to City Limits)
Grand Ave (Plaza Bonita to Pedregosa)
Grand Ave (Valerio to California)
Hillcrest Rd (Mountain to Franceschi Rd)
Las Canoas Rd (Gibraltar to El Cielito)
Las Tunas Rd
Lasuen Rd (APS to Alvarado)
Loma St (Pedregosa to Moreno)
Maple St
Marilyn Way
Mission Ridge Road (Las Alturas to Mountain)
Montgomery St (Emerson to Laguna)
Mountain Drive (City Limits to El Cielito and Mission Ridge to Los Olivos)
Northridge Rd
Orizaba Ln
Overlook Ln (South of APS only)
Rametto Rd (Alston to Summit)
Roble Ln
Rockwood Dr
Santa Teresita Dr
Sierra St
Stanwood Drive
Summit Rd (Alston to Rametto)
Sycamore Canyon (5 Points to Westmont Rd)
Westmont Rd (Sycamore Canyon to top of Circle Drive)
Subscribe to:
Posts (Atom)